Full Remodels · Celina

Floors, paint and a hall bath

Awesome Remodeling

New plank floors went through the main rooms, carpet into two bedrooms and fresh paint on the walls and trim. The hall bath got a new tub, tiled surround and vanity.

Open kitchen with white cabinets and a granite island, with new gray plank flooring running from the living area toward the hallway.

A refresh, room by room.

The house had an older plank floor, damaged baseboards and a hall bath with beige diagonal tile. The job was a refresh: new floors, new baseboards, paint and a rebuilt hall bath.

Vinyl plank went into the entry, living room, dining room, hallways, closets and kitchen, and carpet into two bedrooms. New baseboards and paint finished the rooms. In the hall bath the tub was replaced and the wall was retiled with a niche. A new vanity went in under the original countertop, which was removed and reinstalled, and the bath got a new floor. The kitchen cabinets and counters stayed as they were.

Location
Celina, TX
Scope
Interior refresh and hall bath
Floors
Vinyl plank in the main areas, carpet in two bedrooms
Built
November 2024 to December 2024

The finished work

As it was
handed over.

How it was built

Three parts of the house show the job, each from the old or stripped-out room to the finished one.

Chapter 1: Living room and kitchen floor

The old plank floor came up across the living room and kitchen, down to a bare floor. New vinyl plank went down through the living room, the kitchen and into the hall, and new baseboards went in along the walls before the walls and trim were painted. The kitchen cabinets and counters stayed as they were. Only the toe kicks below them were painted.

Living room with a patio door, three windows, white baseboards and new plank flooring.
The living room with the old plank floor partly pulled up beside the kitchen island.
Before
The same living room with new plank flooring running to the patio door, beside the kitchen island.
After
  1. Open living area with the old floor removed down to a bare floor, and the kitchen and island beyond.
    The old floor removed across the living area
  2. Plank flooring laid in an entry and hall, with loose planks still on the floor.
    Plank going down in the entry and hall
  3. Living room with the windows taped off, paper over the floor and a boxed cabinet in the middle of the room.
    Windows taped and the floor covered for painting

Chapter 2: The dining room

The old plank floor came up in the dining room, and new plank was laid wall to wall. New baseboards went in and were painted with the rest of the trim.

Dining room with two windows, white baseboards and new plank flooring, with the kitchen through the opening at left.
The dining room before, with planks of the old floor pulled up near the doorway.
Before
The same dining room with a chandelier, two windows, white baseboards and new plank flooring.
After
  1. Plank flooring partly laid in the dining room with loose planks on the floor.
    Plank going down in the dining room
  2. Dining room floor covered with paper and tape under a chandelier and a window.
    The new floor covered with paper and tape

Chapter 3: The hall bath

The old diagonal wall tile and the tub came out. A new tub went in with a tiled surround and a niche, and a new vanity was set under the original countertop, which was reinstalled. The bath also got a new floor.

Gray tile tub wall with a framed niche and a shower head, between tiled side walls.
Hall bath with beige diagonal wall tile, the lower rows and the old tub already removed.
Before
The hall bath with a tiled tub wall and niche, a white vanity, a large mirror and gray floor tile.
After
  1. Tub wall with the old tile removed and a toilet at the edge of the frame.
    The tub wall after the old tile came off
  2. Gray wall tile set over the new tub, with the niche opening not yet trimmed.
    Wall tile up over the new tub, before the niche trim
  3. Floor beside the new vanity with ridged setting material spread out.
    The bath floor prepared beside the new vanity

Scope

What the
work covered.

  • Vinyl plank flooring in the entry, living room, dining room, hallways, closets and kitchen
  • Old floor covering removed before the new floor
  • Carpet in two bedrooms
  • New baseboards
  • Wall paint in the entry, kitchen, pantry, living room, hallways, closets and a bedroom
  • Paint on all baseboards and door trim
  • Drywall repair
  • New tub in the hall bath
  • Tiled tub surround with a niche
  • New hall bath vanity with the original countertop reinstalled
  • New hall bath floor
  • Kitchen cabinet toe kicks painted

Start a project

Tell us what
the house needs.

Send the address, a few photos and the rough idea. We will prepare a Feasibility Report before you have spent a dollar.