Full Remodels · Lancaster

Primary bath with a glass wet room

Awesome Remodeling

The oval tub and the old vanity came out. The bath now has a glass-enclosed wet room with a freestanding tub and a shower, a gray vanity and a closet behind mirrored doors.

Glass-enclosed shower with a gold header bar, a gold rain head and body jets on a tiled wall.

A bath opened into one wet room.

The primary bath had an oval tub in a tiled alcove under the window, closed with a shower curtain, an orange vanity and a closet behind gold-framed sliding mirror doors. The bath was demolished and rebuilt, with a new closet and ceiling framed in, new plumbing and electrical, new drywall and tile.

The finished bath has a glass-enclosed wet room with a freestanding tub and a shower, with gold hardware on the glass. Outside the glass sit a gray vanity with a white top and gold pulls and mirrored folding doors to the closet.

Location
Lancaster, TX
Scope
Primary bath and closet
Wet room
Freestanding tub and shower in one glass enclosure
Built
January 2025 to March 2025

The finished work

As it was
handed over.

How it was built

The job went from demolition to plumbing and framing, then tile, the vanity and the glass.

Chapter 1: The wet room and tub

The oval tub under the window came out and the room was opened to bare framing. Plumbing was rerouted, with concrete broken for a relocated line and poured back. Wall and floor tile followed, then a freestanding tub and the glass enclosure.

Freestanding tub with a gold floor-mounted faucet against gray wall tile and a mosaic floor.
The old oval tub under the window, with beige wall tile and a shower curtain.
Before
The freestanding tub in the glass wet room, with the window above the gray tile.
After
  1. Bare framing and a concrete floor around the window.
    The room opened to bare framing around the window
  2. Wall tile going up and a mosaic floor started, with red waterproofing around the window.
    Wall tile going up and the mosaic floor started
  3. A freestanding tub in place against finished wall tile, with a ladder inside it.
    The freestanding tub set in place against the wall tile

Chapter 2: The view from the door

From the door, the old bath had a tub behind a curtain on the left and an orange vanity on the right. That side is now the glass wet room, with a rain head, body jets and a handheld shower, and a vanity with a white top stands on the right. Supply lines were run in the open wall, and the walls were closed with drywall before tile.

Shower wall with a gold rain head, handheld shower and body jets beside the window.
The old bath from the door, with a curtained tub on the left and an orange vanity on the right.
Before
The new bath from the door, with the glass shower on the left and the white-topped vanity on the right.
After
  1. Blue supply lines running through open wall framing.
    Supply lines in the open wall
  2. Drywall hung on the walls around the window, with a ladder in the room.
    Drywall going up around the window
  3. Wall tile, a mosaic shower floor and large floor tile in place.
    Wall tile and floor tile in place before the fixtures

Chapter 3: The closet wall and vanity

The entry wall had the bedroom door, a closet behind gold-framed sliding mirror doors and the tiled end of the tub alcove. A new closet was framed with a rod and a shelf, and it now closes with mirrored folding doors beside the glass wet room. The vanity wall got a gray vanity with a white top, gold pulls and a gold faucet.

Mirrored folding closet doors beside the glass wet room, with its gold header bar, gold pull, body jets and handheld shower.
The old entry wall with a bedroom door, gold-framed sliding mirror doors on a full closet and the tiled end of the tub alcove at the right.
Before
The same wall now: a gray vanity under a wide mirror, the bedroom door and mirrored folding closet doors at the right.
After
  1. A framed opening with drywall hung inside it.
    A framed opening with drywall hung inside
  2. A closet with a hanging rod and a shelf, the floor covered in blue protection.
    The closet with its rod and shelf in place
  3. A gray vanity cabinet set against the wall beside a window taped in blue.
    The vanity cabinet set in place beside the window

Scope

What the
work covered.

  • Demolition of the primary bath
  • Concrete broken to relocate a plumbing line, then poured back
  • Waterproofing in the shower
  • Freestanding tub and plumbing trim installed, toilet reinstalled
  • Framing for a new closet and ceiling
  • Drywall on walls and ceiling, taped and bedded
  • Electrical rough-in and trim
  • Wall tile and floor tile
  • Glass shower enclosure with gold hardware
  • Vanity and mirror installed
  • Two closet doors
  • Baseboards and paint

Start a project

Tell us what
the house needs.

Send the address, a few photos and the rough idea. We will prepare a Feasibility Report before you have spent a dollar.