A second floor over a one-story garage, with a living area, a small kitchen, a full bath and a new stair from inside the house.

Finished second-floor living area with gray plank flooring, three windows, a ceiling fan and a white kitchenette on the right.

A second floor, built over the garage.

The house had a two-car garage with an unfinished attic space above it. Instead of building out, we went up.

We framed a new second story over the garage, with a living area, a kitchenette and a full bathroom. A new staircase connects it to a room inside the existing house.

Location
Coppell, TX
Scope
Second story with bath, kitchenette and stairs
Size
425 sq ft
Built
August 2025 to February 2026

The finished work

As it was
handed over.

How it was built

The job followed the house from the outside in: the new structure and exterior, the living area, the stairs, and the bathroom.

Chapter 1: The second story and exterior

We framed a new second story on top of the garage, wrapped it in sheathing and finished the outside with wood siding.

The garage with its new second story clad in horizontal wood siding and a tall narrow window.
The single-story garage before work began, open and full of stored boxes.
Before
The same garage front with the second story clad in wood siding above the garage door.
After
  1. Framed second story covered in green wall sheathing above the brick garage.
    The second story framed and sheathed above the garage
  2. Pallets of brick in front of the garage, with the upper walls still in sheathing.
    Brick delivered while the upper walls were still in sheathing
  3. Two workers on a ladder fastening wood siding to the upper wall.
    Wood siding going up the new wall

Chapter 2: Living area and kitchenette

Above the garage there was an attic with loose wiring. It is now a living room with a small kitchen along one wall. Spray foam went into the ceiling and walls before the flooring and cabinets.

Finished second-floor room with three windows, a mini split on the left, a ceiling fan and gray plank flooring.
Second-floor wall framing and subfloor with trusses overhead.
Before
Finished kitchenette with white shaker cabinets, gold pulls and a black sink, with the bathroom door open on the left.
After
  1. The attic above the garage, with rough decking and loose cable.
    The attic above the garage before the new floor was framed
  2. Spray foam on the ceiling around a recessed light housing.
    Spray foam on the ceiling, with a recessed light housing in place
  3. Room with gray plank flooring and base cabinets installed along one wall.
    Flooring down and kitchenette cabinets set, before the countertop

Chapter 3: The new stairs

The way up is a new staircase that starts in an existing room of the house. We framed the wall beside the stairs, finished the treads and added a black railing.

Looking down the finished staircase, with gray treads and a black wall-mounted handrail.
The room in the house where the staircase now begins, filled with boxes before the work.
Before
Looking up the finished staircase toward a glass-panel door, with a black wall-mounted handrail.
After
  1. Rough wood stair steps next to a newly framed wall.
    Rough stair steps and the new framed wall beside them
  2. Finished stair treads with blue tape marking them off.
    New treads in place and taped off
  3. Unpainted wood handrail on black metal balusters.
    Handrail mounted on the balusters before painting

Chapter 4: The bathroom

The bathroom started as a marked corner of bare subfloor. We built the shower, set the tile and installed a vanity, a toilet and a glass panel.

Finished bathroom with a white vanity, black vessel sink, toilet and a tiled shower with a glass panel.
Bare framed corner of the second floor with the shower location marked in green paint.
Before
The finished bathroom looking from the vanity toward the shower, with black floor tile.
After
  1. Shower walls prepared for tile, with a formed niche and red-coated seams.
    Shower walls and niche prepared for tile
  2. Wavy wall tile partly set in the shower with a mosaic floor.
    Wall tile going up, with the mosaic shower floor in place
  3. White vanity cabinet without its top beside a toilet and the tiled shower.
    Vanity cabinet and toilet installed before the final fixtures

Scope

What the
work covered.

  • Second-story addition with a bathroom, a kitchenette and stairs
  • Framing of the new structure, wall and roof sheathing, shingles
  • Wood siding, exterior paint, gutters, soffit and fascia
  • Spray foam insulation on the ceiling and walls
  • Drywall, texture and interior paint
  • Electrical wiring with recessed lighting and a ceiling fan
  • Plumbing for the new bath and kitchenette, with a water heater
  • Split-system HVAC for the new floor
  • Shower tile, glass panel, vanity and plumbing fixtures
  • Kitchenette cabinets, countertop and tile backsplash
  • Stairs with solid wood steps and a handrail
  • Windows, doors, baseboard and trim

Start a project