A one-story addition on the back of an older Dallas house, tied into the existing home and opening onto a new deck.

The finished blue addition in the early evening with French doors, a side door, lit wall lights and a deck.

More room at the back of the house.

The house was a one-story home with gray siding and a plain back wall. The owners asked for new space at the rear, built to the architectural drawings they provided, plus a deck to step out onto.

We poured the footings, framed the floor, walls and roof, closed the addition in, and finished the inside with a new room with built-in cabinets, a laundry room and a hallway that connects to the existing house. A deck with concrete steps runs along the back.

Location
Dallas, TX
Scope
Rear addition with deck
Addition slab
307 sq ft
Deck
23 ft 10 in by 10 ft
Built
November 2024 to October 2025

The finished work

As it was
handed over.

How it was built

The job moved from the ground up, and each part below shows one stage of it.

Chapter 1: Footings, framing and closing in

Concrete footings went in along the back of the house first, then the wood floor framing, walls and gable roof. Green sheathing panels with taped seams closed the walls in, the windows and French doors were set and sealed with foam, and new siding went on and was painted.

Framed walls and gable roof of the addition standing on the new floor, with sheathing panels on the floor frame in front.
The original back wall of the house with wood forms set out for the addition.
Before
The back of the house with the finished addition, French doors and two windows in blue siding.
After
  1. Poured concrete beam inside wood forms next to the house.
    A concrete beam freshly poured in its forms beside the house
  2. Addition wrapped in green sheathing with plastic over the window and door openings.
    Walls wrapped in sheathing with the openings covered in plastic
  3. A window and French doors installed in the green sheathing with foam sealing the edges.
    Windows and French doors set and sealed with foam

Chapter 2: Deck and steps

The deck was framed off the back of the addition, then covered with brown boards and a stepped skirt. A set of concrete steps was poured at one end.

The deck in front of the addition with two rocking chairs and the wood-framed glass side door.
The back yard at the start of the job, with the original house and the wood forms laid out.
Before
Finished concrete steps leading up to the deck.
After
  1. Deck joists framed beside the addition.
    Deck joists framed beside the addition
  2. Brown deck boards being laid over the deck framing.
    Deck boards going down over the framing
  3. Newly poured concrete steps at the foot of the deck.
    Concrete steps just finished at the foot of the deck

Chapter 3: Inside the new room

Insulation went into the walls and ceiling, then drywall was hung and taped. A built-in cabinet was fitted with the new floor covered, and the room ended up with a dark vinyl plank floor, painted trim and a mini-split on the wall.

The finished room with a dark vinyl plank floor, two windows and a mini-split on the wall.
The framed room with wall studs, sheathing, wiring and an electrical box before finishes.
Before
Built-in green cabinets with gold pulls and a row of drawers, beside the doorway to the hallway.
After
  1. Insulation between studs and in the ceiling around two new windows.
    Insulation in the walls and ceiling around the windows
  2. Taped drywall seams on the walls and ceiling with supplies stacked on the subfloor.
    Drywall hung and taped
  3. Unpainted built-in cabinet with open cubbies and drawers, with the floor protected by paper.
    The built-in cabinet set in place with the floor protected

Chapter 4: Hallway to the house

The old back doorway of the house became the way into the addition. A hallway was framed between the two, with a new window and a pocket door frame, then drywalled, floored and fitted with tall cabinets.

The finished hallway with a tall window, green cabinets and a glass door at the far end.
The original white back door of the house, set in gray siding.
Before
A six-panel door at the end of the finished hallway, next to green cabinets and a window.
After
  1. Hallway framing with the existing house door at the far end.
    Hallway walls framed up to the existing door
  2. A new window in the hallway with studs and flexible duct still exposed.
    A new window in the hallway before the walls were closed
  3. Hallway with drywall hung and a pocket door frame on the left.
    Drywall hung and the pocket door frame in place

Scope

What the
work covered.

  • Concrete slab, grade beams, footings and piers
  • Floor joists, wall framing, roof framing and roof deck
  • Sheathing, underlayment and shingles over the addition
  • Five vinyl windows, an aluminum French door and an exterior door
  • Insulation in the walls, ceiling and under the floor
  • New electrical wiring, a relocated panel and recessed lights
  • Relocated washer, dryer and drain lines and a relocated water shutoff
  • One ductless mini-split
  • Drywall, interior paint, trim and interior doors
  • Vinyl plank flooring, plus tile in the laundry room
  • Custom built-in cabinets and laundry cabinets
  • Siding, exterior paint, deck framing and decking, and concrete steps

Start a project

Tell us what
the house needs.

Send the address, a few photos and the rough idea. We will prepare a Feasibility Report before you have spent a dollar.