Custom Kitchens · Dallas

Long kitchen with full-height cabinets

AG Signature Kitchens

The first floor was stripped back, then rebuilt around a long kitchen with full-height cabinets, a quartz island and oak floors.

Kitchen with three woven pendant lights, a farmhouse sink under a black-framed window and lit upper cabinets.

A kitchen rebuilt along a long room.

This was part of a full-house remodel. On the first floor the drywall and the old floor came out, opening the room down to the framing.

New water lines went in for the sink, an ice maker and a pot filler, the gas and electrical lines were moved, and a vent was run for the hood. The island was framed, then the painted cabinets, quartz counters, tile backsplash and oak floors went in.

Location
Dallas, TX
Scope
Kitchen in a full-house remodel
Cabinetry
Painted cabinets with a full-height pantry wall and a paneled island
Counters
Quartz
Floors
Oak hardwood
Completed
March 2025

The finished work

As it was
handed over.

Dark cabinets around a farmhouse sink under a black-framed window, with a green tile backsplash.

How it was built

The same job rebuilt much of the house. Three parts of it, the kitchen, the primary bath and the stairs, show how the work went from rough walls to finished rooms.

Chapter 1: The kitchen

The first-floor drywall and the old floor came out, and the kitchen was rebuilt along the long room. The island was framed and the painted cabinets went in, followed by the quartz counters and the tile backsplash. The range sits under a stainless hood with a pot filler on the wall, and oak floors run the length of the room.

Full-height painted cabinets beside a gas range with a stainless hood, a tile backsplash and windows at the end of the room.
The long room stripped to exposed ceiling joists, with a brick-pattern floor, windows leaning against the wall and a door at the far end.
Before
The finished kitchen seen toward the far end: painted cabinets on both sides, the quartz island and a black door.
After
  1. Long room with drywall hung, a fireplace mantel on the right and the old floor still down.
    Drywall hung along the long room, with the old floor still down
  2. Kitchen island and cabinets in place, with blue film over the counters and tools on top.
    Cabinets and the island in place, with the counters covered in blue film
  3. Stainless hood over a tile backsplash, with upper cabinets in place and blue film on the counters.
    Hood, backsplash tile and upper cabinets in place

Chapter 2: The primary bath

The bath was framed and drywalled, then the shower was tiled in gray and the wall behind the tub was covered in wood slats. A freestanding tub went in under the window, and the shower got a glass enclosure with black hardware.

Primary bath with a freestanding tub under a window, wood slat wainscot and a gray tile shower behind glass.
Drywalled bath with green drywall around the shower base, a high narrow window, a tall window and a dark doorway on the right.
Before
The finished bath: a freestanding tub under a large window, and a glass shower with a high narrow window beside a tall window.
After
  1. Window with wood slat wainscot below it and a white pipe standing up from the floor.
    The window wall with wood slat wainscot in, and a pipe standing up from the floor
  2. Gray tile on the shower wall with a recessed niche, a narrow window beside it and paper laid over the floor.
    Gray tile on the shower wall, with paper over the floor
  3. Freestanding tub in place beside a glass shower enclosure, with a ladder inside the shower.
    The tub set and the glass shower enclosure installed

Chapter 3: The stairs

The stairs started as rough treads between taped drywall. Oak steps with white risers went in, then the handrail, the newel posts and black metal balusters. The floor and the stair rail were sanded and finished at the end.

Oak handrail and black balusters at the top of the stairs, with an oak floor and doorways beyond.
The stairs at drywall stage: rough treads, taped walls and a window at the top.
Before
The finished stairs with oak treads, white risers, black balusters, an oak newel post and a window at the top.
After
  1. Oak treads set on the stairs, seen from the top landing, with no railing yet.
    Oak treads in place on the stairs, before any railing
  2. Oak newel post and handrail with black metal balusters on the new stairs.
    Newel post, rail and balusters going in on the stairs

Scope

What the
work covered.

  • First-floor drywall and old floor removed
  • New water lines and a drain for the kitchen sink, plus lines for an ice maker and a pot filler
  • Gas and electrical lines moved, a relocated oven line and a vent for the hood
  • Island framing and paneling
  • Painted base, upper and pantry cabinets
  • Quartz counters in the kitchen, laundry room and bathrooms
  • Tile backsplash in the kitchen and laundry room
  • Dishwasher and ice maker installation
  • Oak hardwood floors, sanded and stained
  • Primary bath tile, freestanding tub and glass shower enclosure
  • Oak stair steps, handrails and balusters
  • Structural framing for the second floor

Start a project

Tell us what
the house needs.

Send the address, a few photos and the rough idea. We will prepare a Feasibility Report before you have spent a dollar.