New Construction · Haslet
New home from an empty lot
Awesome Group Construction
A barndominium in Haslet built from the ground up: an empty lot, a concrete slab, a steel building shell and a wood-framed house inside.

From open ground to a finished house.
This was a new build on an open lot in Haslet. The plan was a barndominium: a steel building shell with a wood-framed house inside it, with five bedrooms and three bathrooms.
The steel building shell went up over the slab. We handled the foundation and, inside the shell, the framing, plumbing, electrical, HVAC, insulation, drywall, flooring, tile, cabinets, countertops, trim, paint and gutters.
The finished work
As it was
handed over.




How it was built
Three parts of the job show how the house went together: the lot and the slab, the steel shell and its framing, and one vaulted room from open framing to finished.
Chapter 1: From open lot to slab
The site started as open ground and a few trees. Over the following months the site was graded, the forms and piers went in, and trenches were dug for the lines that run under the slab. Plastic sheeting and rebar were laid out inside the forms, and the concrete slab was poured in December 2025.



-

Wood forms staked along the edge of the excavated area -

Pipes and conduit laid in the trenches before the slab -

Plastic sheeting and rebar laid out inside the forms before the pour
Chapter 2: Steel shell and wood framing
The steel building went up over the slab in March and April 2026, with its windows and exterior panels. Inside it, we framed the interior walls in wood starting in April, and the plumbing, electrical and HVAC rough-in ran from late April through May.



-

Steel columns and roof trusses standing over the slab in March 2026 -

Steel wall panels, windows and a dark base on the outside of the shell -

Wood wall framing standing inside the steel building
Chapter 3: The vaulted room
One large room with a vaulted ceiling shows the change from bare framing to finish. In early May it was roof framing and open studs. Across the house, insulation went in at the end of June, drywall followed in July and the vinyl plank floor was down by early August. The finished room has a wood beam, a ceiling fan and a sliding glass door.



-

Insulation on the walls and under the roof before drywall -

Drywall hung with the beam in place and a ladder at the door opening -

The vinyl plank floor down, before baseboards and devices
Scope
What the
work covered.
- Concrete slab foundation with piers
- Interior wall framing in wood
- Plumbing rough-in and fixtures, with gas lines for the range, water heater and furnace
- Electrical rough-in and trim
- HVAC ductwork and equipment
- Wall and ceiling insulation
- Drywall with a light orange peel texture, and interior paint
- Vinyl plank flooring and baseboards
- Tile for the showers, shower floors and kitchen backsplash
- Kitchen and vanity cabinets with quartz countertops
- Interior doors, trim and gutters
Keep looking
More
projects.

Previous · Dallas
Long kitchen with full-height cabinets
A long first-floor kitchen with full-height cabinets and a quartz island, part of a full remodel.

Next · Arlington
Detached garage with bath and porch
A detached brick garage with three doors, a bathroom and a covered porch, finished in March 2025.