Full Remodels · Dallas

Whole-house remodel with a green tile bath

Awesome Remodeling

We opened up a Dallas house and rebuilt the layout, from the kitchen and bathrooms to the closets and the living room fireplace.

Front of the finished house with a stone path to the double entry doors.

Opened up, then rebuilt room by room.

The house had older plank floors, a dark-cabinet kitchen and an older bathroom layout. The goal was a more open plan with new floors, paint and finishes throughout.

We demolished the kitchen, two bathrooms, the primary bedroom, the office and the living room, then framed a new powder room, primary bath and closet, laundry room and office. A load-bearing wall was opened for the open plan, new plumbing, electrical and mechanical work went in, and the house was insulated, finished and painted.

Location
Dallas, TX
Scope
Whole-house remodel
Built
February 2025 to October 2025
Rooms
Kitchen, bathrooms, closets, fireplace

The finished work

As it was
handed over.

How it was built

Four parts of the house show how the work went, each from the old room to the finished one.

Chapter 1: Kitchen

The old kitchen had dark cabinets and older plank flooring. We took the exterior walls down to the studs and built a long island. New custom cabinets, a chevron tile backsplash, quartz countertops and new floors finished the room.

Kitchen range wall with navy cabinets, a chevron backsplash and a gas range.
Original kitchen with dark cabinets, older plank floors and French doors.
Before
Finished chevron tile backsplash and quartz countertop under a wood cabinet, beside a window.
After
  1. Open wall studs and a bare concrete floor after demolition.
    Walls opened to the studs and a bare slab after demolition
  2. Chevron backsplash tile on the wall between new cabinets.
    Chevron backsplash tile going up between the new cabinets

Chapter 2: Primary bath

The original primary bath was reached through a sliding barn door from the bedroom. We rebuilt it with a large walk-in shower, a freestanding tub under a new window and a floating double vanity. Heated floors were added under large-format tile.

Primary bathroom with a green tile walk-in shower, a lit niche and a black freestanding tub under a window.
Original primary bath seen through a sliding barn door from the bedroom.
Before
Finished primary bath with a black tub under a window, green tile walls and a wood vanity.
After
  1. Orange waterproofing membrane on the walls and floor tile being set with leveling clips.
    Waterproof membrane on the shower walls and floor tile being set with leveling clips
  2. Floating wood vanity with lit mirrors and sconces, mirrors still covered in protective film.
    The floating vanity and lit mirrors in place, still under protective film
  3. Installer standing on a ladder finishing the green tile shower wall.
    Finishing work on the green tile shower walls

Chapter 3: Living room and fireplace

The living room started as a plain room with a pipe shelving unit and older plank floors. We reframed the fireplace wall, insulated it with spray foam and finished it with a clean fireplace surround next to a wall of vertical wood slats. New wide-plank floors run through the room.

Living room with a wall of vertical wood slats and a large picture window.
Original living room with a pipe shelving unit and older plank floors.
Before
Finished living room with a slatted wall and a picture window.
After
  1. New wood framing built around the existing brick fireplace.
    New framing around the existing fireplace
  2. Fireplace wall with spray foam between the studs.
    Spray foam insulation between the studs of the fireplace wall
  3. Finished fireplace surround with the firebox opening and new floors.
    The finished fireplace surround before the room was cleaned up

Chapter 4: Primary closet

The old closet was a plain room with one shelf, a hanging rod and older plank flooring. We framed the space, built custom shelving and drawers on site, painted them and laid new floors.

Finished closet with gray built-in shelving.
Original closet with a shelf, a hanging rod and older plank flooring.
Before
Finished closet with gray shelving and shoe shelves.
After
  1. Unfinished wood cabinet with shelves and drawers inside the closet.
    Closet cabinets and drawers assembled on site, before paint
  2. Closet shelving frame with a panel in place, still unpainted.
    Shelving and panels installed, still unpainted

Scope

What the
work covered.

  • Demolition of the kitchen, two bathrooms, primary bedroom, office and living room
  • New interior framing for a powder room, primary bath and closet, laundry room and office
  • Load-bearing wall opened for an open plan
  • Plumbing, electrical and mechanical rough-in and trim
  • Spray foam insulation on exterior walls, roof and fireplace
  • Drywall, texture and paint throughout
  • Custom kitchen cabinets, quartz countertops and tile backsplash
  • Primary bath with tiled walk-in shower and heated floors
  • Guest bath shower with glass door
  • Fireplace reframed and refinished
  • New flooring and baseboards throughout
  • Custom closets and new interior doors

Start a project

Tell us what
the house needs.

Send the address, a few photos and the rough idea. We will prepare a Feasibility Report before you have spent a dollar.