Full Remodels · Dallas
Whole-house remodel with a green tile bath
Awesome Remodeling
We opened up a Dallas house and rebuilt the layout, from the kitchen and bathrooms to the closets and the living room fireplace.

Opened up, then rebuilt room by room.
The house had older plank floors, a dark-cabinet kitchen and an older bathroom layout. The goal was a more open plan with new floors, paint and finishes throughout.
We demolished the kitchen, two bathrooms, the primary bedroom, the office and the living room, then framed a new powder room, primary bath and closet, laundry room and office. A load-bearing wall was opened for the open plan, new plumbing, electrical and mechanical work went in, and the house was insulated, finished and painted.
The finished work
As it was
handed over.




How it was built
Four parts of the house show how the work went, each from the old room to the finished one.
Chapter 1: Kitchen
The old kitchen had dark cabinets and older plank flooring. We took the exterior walls down to the studs and built a long island. New custom cabinets, a chevron tile backsplash, quartz countertops and new floors finished the room.



-

Walls opened to the studs and a bare slab after demolition -

Chevron backsplash tile going up between the new cabinets
Chapter 2: Primary bath
The original primary bath was reached through a sliding barn door from the bedroom. We rebuilt it with a large walk-in shower, a freestanding tub under a new window and a floating double vanity. Heated floors were added under large-format tile.



-

Waterproof membrane on the shower walls and floor tile being set with leveling clips -

The floating vanity and lit mirrors in place, still under protective film -

Finishing work on the green tile shower walls
Chapter 3: Living room and fireplace
The living room started as a plain room with a pipe shelving unit and older plank floors. We reframed the fireplace wall, insulated it with spray foam and finished it with a clean fireplace surround next to a wall of vertical wood slats. New wide-plank floors run through the room.



-

New framing around the existing fireplace -

Spray foam insulation between the studs of the fireplace wall -

The finished fireplace surround before the room was cleaned up
Chapter 4: Primary closet
The old closet was a plain room with one shelf, a hanging rod and older plank flooring. We framed the space, built custom shelving and drawers on site, painted them and laid new floors.



-

Closet cabinets and drawers assembled on site, before paint -

Shelving and panels installed, still unpainted
Scope
What the
work covered.
- Demolition of the kitchen, two bathrooms, primary bedroom, office and living room
- New interior framing for a powder room, primary bath and closet, laundry room and office
- Load-bearing wall opened for an open plan
- Plumbing, electrical and mechanical rough-in and trim
- Spray foam insulation on exterior walls, roof and fireplace
- Drywall, texture and paint throughout
- Custom kitchen cabinets, quartz countertops and tile backsplash
- Primary bath with tiled walk-in shower and heated floors
- Guest bath shower with glass door
- Fireplace reframed and refinished
- New flooring and baseboards throughout
- Custom closets and new interior doors
Keep looking
More
projects.

Previous · Frisco
Bonus room above the garage
A 480 sq ft brick second story built over a Frisco garage, with its own mini split.

Next · The Colony
Open kitchen and living rooms
Kitchen, living rooms, dining room, hallway and laundry remodeled, with new windows and exterior work.