Full Remodels · The Colony

Open kitchen and living rooms

Awesome Remodeling

A full remodel of the main living areas: a new open kitchen, a family room fireplace with painted brick and a new mantel, and a sunken living room with new windows.

Open kitchen with a wood island and black pendant lights beside a painted brick fireplace and a sliding door to the patio.

Old rooms, one open plan.

The house had a kitchen with wood cabinets and a green countertop, old floors, and living areas that needed new windows, trim and finishes. The owners asked for the kitchen, both living rooms, the dining room and the hallway to be redone, along with window repairs and exterior work.

We took out the old cabinets and flooring, opened the kitchen ceiling, and rebuilt the rooms with new plumbing and electrical, sheetrock, tile, cabinets, quartz countertops, trim and paint. The work ran about four months.

Location
The Colony, TX
Scope
Full remodel
Rooms
Kitchen, 2 living rooms, dining room, hallway, laundry
Built
May 2026 to September 2026

The finished work

As it was
handed over.

How it was built

The work ran from demolition to finish. Three areas show it best.

Chapter 1: The kitchen

The old kitchen had wood cabinets, a green countertop and tile floors. We removed the cabinets and flooring, opened the ceiling, and moved the plumbing for the sink, dishwasher and refrigerator. New white cabinets and a wood island went in, followed by quartz countertops and a tile backsplash.

Kitchen island with a drawer-style microwave, a wood base and quartz top, white cabinets and a black faucet at the sink.
Original kitchen with wood cabinets, a dropped ceiling soffit, a white range and a light green countertop.
Before
Finished kitchen with white cabinets, a wood island with a quartz top, two black pendant lights and a sliding door to the patio.
After
  1. Demolished kitchen with the ceiling open and bare concrete floor.
    Kitchen after demolition, with the ceiling open and the floor bare
  2. White cabinets and a wood island set on new floor tile.
    White cabinets and the island set on the new floor tile
  3. Gray vertical tile on the wall behind the range, with white cabinets and countertops installed.
    Vertical backsplash tile on the range wall with the countertops in

Chapter 2: The family room fireplace

The family room had natural brick, old tile floors and window openings that needed work. We removed the floor, painted the brick and installed a wood mantel. The new windows have black frames, and new floor tile was set across the room.

Finished family room with a painted brick fireplace and two black-framed windows.
Family room early in the job, with natural brick, old tile floor and window openings framed for new windows.
Before
The painted brick fireplace with a wood mantel, black-framed window and sliding door, seen from the kitchen island.
After
  1. Broken floor tile stacked in piles on a bare floor, with the ceiling open.
    Old floor tile removed, with the kitchen ceiling open above
  2. Fireplace brick painted white, with plastic laid on the floor.
    Fireplace brick painted white, before the new floor tile
  3. New floor tile being laid with spacers in front of the fireplace and the sliding door.
    New floor tile being laid with spacers in front of the fireplace

Chapter 3: The sunken living room

The sunken living room had beige carpet, a metal railing and a dark beam. We repaired the ceiling and walls, replaced the arched windows, wrapped the beam in light wood and built a half wall with a wood cap. The floor was cleared down to the concrete before the new carpet went in.

Finished sunken living room with gray carpet, a light wood beam and a half wall beside the dining area.
Original sunken living room with beige carpet, a metal railing, a dark beam and arched windows.
Before
The sunken living room with two arched black-framed windows, a light wood beam and new carpet.
After
  1. Room with a new black-framed arched window and patched drywall on the walls and ceiling.
    New arched window in place, with patched drywall and the beam clad in bare wood
  2. A worker in protective clothing spraying paint on the ceiling, with the arched windows covered in plastic.
    Ceiling being spray painted, with the arched windows covered in plastic
  3. Two workers sweeping a floor cleared down to bare concrete.
    Floor cleared to bare concrete and swept before the new carpet

Scope

What the
work covered.

  • Kitchen demolition, with new cabinets, island and quartz countertops
  • Tile backsplash and new floor tile in the kitchen and laundry room
  • Plumbing moved and reconnected for the sink, dishwasher, refrigerator and washer
  • New sheetrock, texture and paint on walls and ceilings
  • Electrical work with recessed LED lights, switches and outlets
  • Half wall built in the dining room and topped with wood
  • Living room beam covered and stained
  • Decorative fireplace mantel made and installed
  • Windows repaired and replaced, with two new window openings
  • New front door, interior doors, baseboards and trim
  • New carpet
  • Exterior work, including siding, soffit and paint