Full Remodels · Sachse

Kitchen, baths and an opened wall

Awesome Remodeling

The kitchen and the primary bath were taken down to the framing and rebuilt, the guest bath was redone, and a load-bearing wall was opened up.

Finished kitchen with white cabinets to the ceiling, a white range hood, subway tile and a quartz island.

Rebuilt room by room.

This single-family house in Sachse needed work in most of its rooms: the kitchen, the primary bathroom, the guest bathroom and the office, plus a structural opening to make the plan more open.

We opened walls, moved plumbing and electrical, framed new walls where the layout changed, replaced 18 windows and finished the rooms with drywall, paint, trim and six new interior doors.

Location
Sachse, TX
Scope
Kitchen, primary bath, guest bath, office and an opened wall
Windows
18 replaced
Built
December 2024 to May 2025

The finished work

As it was
handed over.

How it was built

Three parts of the house, from the first demolition to the finished room.

Chapter 1: The kitchen

The old kitchen was taken down to the studs so the walls, plumbing and electrical could be reworked. New white cabinets now run to the ceiling around a navy island, with quartz counters, subway tile, a range hood and a pot filler.

Finished kitchen seen from the island, with lit subway tile behind the counters.
Original kitchen with gray arched cabinet doors and a microwave on the counter.
Before
The same kitchen with white cabinets to the ceiling and a navy island.
After
  1. Kitchen with the cabinets removed and the wall framing exposed.
    The kitchen stripped to the studs, with the old cabinets gone
  2. New unfinished cabinet boxes set along the kitchen walls.
    New cabinet boxes set along the walls
  3. Painted kitchen cabinets with blue plastic over the counters and subway tile half set.
    Painted cabinets, covered counters and subway tile going up

Chapter 2: The primary bathroom

The primary bath was opened to the framing and rebuilt around a walk-in shower with a glass door, a tiled bench and niche, and a large hexagon floor. A double wood vanity with a quartz top and a walk-in closet with a shelf tower and hanging rods complete the suite.

Double wood vanity with a quartz top and three wall lights beside the glass shower.
Original bathroom with the old toilet and sink pulled out and the wall plumbing exposed.
Before
The finished toilet room, shower and wood vanity after the remodel.
After
  1. Shower valve and supply lines mounted in an opened stud wall.
    Shower valve and supply lines mounted in the opened wall
  2. Large hexagon floor tile being set over an orange membrane next to green wall board.
    Hexagon floor tile going down over an orange membrane
  3. Subway tile set around the shower valve with a red waterproofed edge beside it.
    Subway tile going up around the shower valve

Chapter 3: The living room

In the living room the brick fireplace went from gray to navy and received a new mantel. The ceiling beam received a new dark cover, and the room was repainted around it.

Navy painted brick fireplace with a white mantel and a wood top.
Brick fireplace painted gray with a dark wood mantel.
Before
The same fireplace painted navy with a white mantel and a wood top.
After
  1. A worker holding a level against the new cover on the ceiling beam.
    Leveling the new cover on the ceiling beam
  2. Navy painted brick fireplace with the hearth covered in paper.
    Fireplace brick painted navy, with the hearth covered for the next step

Scope

What the
work covered.

  • Load-bearing wall opened for a more open plan, with a structural engineering report
  • Kitchen taken down and rebuilt with pre-fab base and upper cabinets, a navy island and quartz counters
  • Kitchen sink, faucet and disposal, a pot filler and a vent hood with LED lighting under the cabinets
  • Switches and outlets relocated, ten LED recessed lights and four ceiling fans
  • Primary bath: walk-in shower with tiled walls and floor, a glass door, quartz niches and a double vanity with a quartz top
  • Primary bath exhaust fan ducted to the exterior; walk-in closet finished
  • Guest bath: demolition, framing, plumbing rough-in, tile, a new tub and a quartz-top vanity
  • Office: walls demolished and reframed, then drywall, texture, paint and flooring
  • 18 vinyl windows replaced and brick repaired around three windows
  • Click-lock vinyl plank flooring and solid wood baseboards with crown molding
  • Six interior doors and one French door
  • Interior painting, plus exterior window frames and brick repainted