Full Remodels · Duncanville
House rebuilt after water damage
Awesome Remodeling
After water damage, the lower walls of this Duncanville house were cut open and its floors taken up to the concrete. We rebuilt it with new drywall, tile floors, cabinets and paint.

From bare concrete back to a finished house.
After the water damage, the lower part of the walls was cut open and the flooring was taken up to the bare concrete in the living area, the kitchen, the bathrooms, the closet and the laundry room.
We closed the walls with new drywall, taped and textured the whole house, laid large-format tile, built and installed cabinets, and painted. The work ran from late May to September 2025.
The finished work
As it was
handed over.




How it was built
Four parts of the house show the work, from open walls and bare concrete to the finished room.
Chapter 1: Living area and floors
The living area had its lower drywall cut away and its floor removed down to the concrete. New drywall went in along the bottom of the walls, followed by texture, paint and large-format tile with a marble look. One wall was painted navy.



-

New drywall along the bottom of the wall, with the floor still bare -

Large-format floor tile set with leveling clips -

The new tile floor covered with paper and tape
Chapter 2: Bathrooms
Both bathrooms had their lower drywall cut away and their floors stripped. The tiled shower and tub walls were already in place and stayed. New drywall, vanity cabinets and gray floor tile went in, and countertops, sinks and black fixtures finished the rooms.



-

Vanity cabinets set against the wall, before countertops and floor tile -

Gray floor tile laid, with the vanity cabinets still waiting for their tops -

Countertop and sinks set on the vanity
Chapter 3: Closet
The closet had its lower drywall cut away and its floor stripped to the concrete. New shelving units went in next to the hanging rods, the walls were finished and gray tile was laid on the floor. The shelving and rods were then painted.



-

Shelving units set in the corner, with new drywall along the bottom of the wall -

Gray floor tile laid beside the unpainted shelving
Chapter 4: Laundry room
The laundry room had the same cut-away walls and bare concrete. New drywall went in along the bottom of the walls and upper cabinets were set above the washer hookups. The cabinets were then painted navy.



-

Upper cabinets set on the wall, still unpainted -

Upper cabinets in white, with paper down on the floor
Scope
What the
work covered.
- Demolition, including removal of 1,450 sq ft of flooring
- Wall framing for a pantry, with an added outlet
- Spray foam wall insulation
- New drywall along the lower walls, with tape, bed and texture through the whole house
- Custom kitchen base cabinets, an island with slat paneling and the existing upper cabinets resurfaced
- Custom vanities, closet shelving and built-in cabinets
- Countertops in the kitchen and bathrooms
- Large-format marble-style tile in the main rooms and gray tile in the bathrooms and closet
- Eleven interior doors, with door trim and baseboards
- Interior walls primed and painted, along with cabinets, vanities, closet shelving and trim
- Plumbing and electrical trim, including toilets, faucets, a disposal and a dishwasher, plus electrical wall plates
- Final cleaning and a closeout walkthrough
Keep looking
More
projects.

Previous · Sachse
Kitchen, baths and an opened wall
A kitchen, two bathrooms, an office and an opened load-bearing wall in one Sachse house.

Next · Frisco
Kitchen, fireplace and staircase remodel
A Frisco house remodeled inside: new kitchen, tiled fireplace wall, curved stair and primary bath.
Start a project
Tell us what
the house needs.
Send the address, a few photos and the rough idea. We will prepare a Feasibility Report before you have spent a dollar.