We rebuilt the kitchen, fireplace wall, staircase and primary bath of a two-story Frisco house, then finished the floors and paint throughout.

Two-story entry with a curved staircase, a black balcony railing and a crystal chandelier.

Dark cabinets, stone and carpet, replaced room by room.

The house had a kitchen with dark cabinets and tile floors, a living room with a white stone fireplace and dark wood floors, and a curved staircase covered in beige carpet. The work covered the kitchen, the fireplace wall, the stairs and the primary bath, plus new floors and paint on both stories.

We demolished the kitchen, the primary bath and the old floors, framed in LVL beams and TJI supports, and opened a load-bearing wall for a more open plan. New plumbing, electrical and gas work went in, followed by drywall, paint, cabinets, tile, stair carpentry and a new fireplace wall. Vinyl plank flooring now runs through both floors.

Location
Frisco, TX
Scope
Whole-house remodel
Built
March 2025 to August 2025
Rooms
Kitchen, living room, stairs, primary bath

The finished work

As it was
handed over.

How it was built

Four parts of the house show how the work went, from the original room to the finished one.

Chapter 1: Kitchen

The old kitchen had dark cabinets, speckled counters and tile floors. We demolished it, relocated the gas line and the range hood vent, and set new custom cabinets along the walls and around the island. Quartz countertops, under-cabinet lighting and painted cabinet fronts finished the room.

Kitchen ceiling with lit linear pendant lights over white high-gloss cabinets and a black range hood.
Original kitchen with dark cabinets, a double wall oven, a blue tile backsplash and an island.
Before
Finished kitchen with lit linear pendant lights, white high-gloss upper cabinets and a wall-mounted hood.
After
  1. Old kitchen with the double oven still in place, a trash bag in the doorway and tile floor debris.
    The old kitchen at the start of demolition, with the floor tile coming up
  2. Plain new cabinet boxes along a kitchen wall with the ceiling drywall taped.
    New cabinet boxes along the kitchen wall before countertops
  3. Island clad in dark ribbed panels with white upper cabinets and a hood behind it, floors covered in paper.
    White cabinets, hood and island panels installed, with the room still covered

Chapter 2: Living room and fireplace

The living room had a white stone fireplace with a dark wood mantel and dark wood floors. We demolished the stone and hearth, repaired the framing and covered the wall with large black tile panels. A new linear fireplace sits in the tile, and new plank flooring runs through the room.

Tall window next to a dark tiled fireplace wall in the living room.
Original white stone fireplace with a dark mantel, a leather sofa and a patterned rug.
Before
Finished living room with tall windows, a dark fireplace wall with a linear fireplace and a white sectional sofa.
After
  1. Fireplace wall covered in new drywall with a ladder and plastic sheeting around the room.
    New drywall on the fireplace wall, with the room covered in plastic
  2. Black tile panels fixed to the fireplace wall with yellow clips and a large panel laid on the floor.
    Large black tile panels being set on the fireplace wall

Chapter 3: Stairs and entry

The curved staircase was covered in beige carpet and had twisted iron balusters. We removed the carpet, fitted wood treads, installed new black balusters and painted the stairs. LED strips light each step, and plank flooring now runs through the entry.

Curved staircase with a black iron railing and a hanging crystal chandelier.
Original curved staircase with beige carpet and iron balusters, looking toward the living room.
Before
Finished stair wall curving down to a plank floor, with a light glowing along the baseboard.
After
  1. Bare wood treads on the curved stair with pencil marks on the risers.
    New wood treads on the curved stair before painting
  2. Curved staircase with the black handrail and balusters installed and the treads still raw.
    Black rail and balusters in place, with the treads still unfinished
  3. Steps lit by LED strips along each riser beside the black railing.
    LED strips lit along the steps

Chapter 4: Bathrooms

The primary bath started with a tub deck under an arched window and a separate shower. We demolished it, moved the drains and the shower and tub supply lines, and rebuilt it as a large glass-enclosed wet area with a freestanding tub, geometric tile, two niches, two narrow windows and a vanity with a lit mirror. The guest bath and the two upstairs bathrooms also got new tile and vanities, and the upstairs baths got lit mirrors.

Bathroom wall with blue mosaic stripes on white marble-look tile beside a round lit mirror.
Primary bath during demolition, with the old tub deck under an arched window and an exposed shower wall.
Before
Finished primary bath with a freestanding tub, geometric wall tile, two niches and a glass enclosure.
After
  1. Primary bath vanity wall with wall lights, double closet doors, a bucket on the floor and pipes exposed at the floor edge.
    Vanity wall and closet doors during demolition, with plumbing exposed at the floor
  2. Geometric tile, a shower niche and a black shower panel in the primary shower.
    Geometric wall tile, a niche and the shower panel installed before the glass

Scope

What the
work covered.

  • Demolition of the kitchen, primary bath, old floors and the fireplace stone
  • LVL and TJI framing, with a load-bearing wall opened for an open plan
  • New plumbing, electrical and gas work, including relocated drains and the kitchen gas line and hood vent
  • Custom kitchen cabinets, island paneling and quartz countertops
  • Kitchen cabinets painted, with doors and drawers built and fitted on site
  • Primary bath rebuilt with a tiled glass-enclosed shower and a freestanding tub
  • Guest and upstairs bathrooms retiled with new vanities, plus lit mirrors upstairs
  • Fireplace framing repaired and the wall covered in black tile, with a new electric fireplace
  • Stair carpentry, new balusters, paint and LED step lights
  • Vinyl plank flooring on both floors and carpet in the TV room
  • Drywall repairs, texture and paint on walls, ceilings, trim and 27 interior doors