Full Remodels · Irving
Whole-house remodel, inside and out
Awesome Remodeling
We opened up an older Irving house, rebuilt the kitchen and two bathrooms, laid new floors and refinished the outside.

Rebuilt inside, refinished outside.
The house was an older home with a closed-off kitchen, two bathrooms with older tile and fixtures, and worn flooring. The work covered the whole house.
We opened up the walls and ceilings, then rebuilt the inside with new plumbing, electrical and heating and cooling work, spray foam insulation, new drywall, windows and vinyl plank flooring. The kitchen got an island and new cabinets, both bathrooms were retiled with glass shower doors, and the outside got new siding and fresh paint.
The finished work
As it was
handed over.




How it was built
Four parts of the house show how the work went, from the old rooms to the finished ones.
Chapter 1: Kitchen and living area
The old kitchen was a closed-in room with yellow cabinets and a tile floor. A wall was opened so the new kitchen is open to the living area, with white shaker cabinets, an island with a quartz top, a farmhouse sink under a window and white subway tile.



-

The old kitchen area after demolition, with ceiling joists and ducts exposed -

The island countertop set on unfinished cabinets, with the sink wall beyond -

Island and cabinets masked off while they were painted
Chapter 2: Bathroom under a window
This bathroom began as a tub alcove under a small window, with pink tile on the lower walls. The alcove was opened up and rebuilt as a tiled shower with a glass door and a mosaic floor, with a vessel-sink vanity beside it.



-

The tub alcove opened up, with the window opening and old tub still in place -

Shower walls coated red around the window opening
Chapter 3: Second bathroom
The second bathroom was a small room with an older vanity, a medicine cabinet and a tile floor. It was rebuilt with a tiled shower with a recessed niche and a mosaic floor, a glass door, a new vanity beside a window and large-format floor tile.



-

Green board in the shower alcove with the niche opening cut and tile started on one wall -

The shower tiled with its niche while the wall below was still open
Chapter 4: Hallway and bedrooms
The hallway started with older flooring and a textured wall and ceiling. Its walls and ceiling were opened up for wiring and ductwork, new drywall went up, the door openings were framed and vinyl plank flooring was laid across the house.



-

The hallway opened up, with wiring and ductwork run overhead -

Flooring laid down the hallway with the door openings framed -

Interior doors hung along the new hallway floor
Scope
What the
work covered.
- Interior demolition of walls, ceilings and the old kitchen
- Wall opened to connect the kitchen and living area
- Plumbing rough-in and trim, with a water heater installation
- Electrical panel relocation, rough-in and trim
- Heating and cooling system work
- New windows and replaced exterior siding
- Spray foam insulation and new drywall
- Kitchen cabinets, island, quartz countertops and tile backsplash
- Two bathrooms with tiled showers, glass doors, new vanities and mirrors
- Vinyl plank flooring, baseboards and interior doors throughout
- Interior and exterior paint, including the kitchen cabinets
Keep looking
More
projects.

Previous · Frisco
Kitchen, fireplace and staircase remodel
A Frisco house remodeled inside: new kitchen, tiled fireplace wall, curved stair and primary bath.

Next · McKinney
Stone counters and wood floors
Stone counters in the kitchen, baths and a new bar, and light wood flooring in place of the carpet.
Start a project
Tell us what
the house needs.
Send the address, a few photos and the rough idea. We will prepare a Feasibility Report before you have spent a dollar.