Additions · Grand Prairie

Gym addition with a mirror wall

Awesome Additions

We built a 343 sq ft gym onto the side of a Grand Prairie house, from the slab and framing to the mirror wall, the rubber floor and the French doors.

Finished gym with a mirror wall, wood shelves with black bars, a ceiling fan and LED light along the ceiling molding.

A new gym room on the side of the house.

The house is a single-story brick home with a side yard along a wood fence. The job was a gym addition: a new room of 343 sq ft joined to the existing house.

We poured a new slab with grade beams, framed the room, sheathed it and put the roof on, then added the mini split, wiring, insulation and drywall. Inside went a rubber gym floor, a wall of mirrors, a dark accent wall and LED lighting in the ceiling molding. Outside, brick walls, French doors and a small concrete landing close the room to the yard.

Location
Grand Prairie, TX
Scope
Gym addition with an exterior landing
Size
343 sq ft
Features
Mirror wall, rubber floor, mini split
Started
March 2026

The finished work

As it was
handed over.

How it was built

Four parts of the job show how the room went up, from the new slab to the brick and doors.

Chapter 1: Slab and footings

The addition sits against the side of the existing brick house, next to a wood fence. We dug the footing trenches along the wall, set the form boards, tied rebar over black sheeting and poured a 343 sq ft slab with 146 linear feet of grade beams and footings.

Dug ground beside the brick wall of the house, with a narrow trench between two mounds of soil and form boards around the edge.
Side of the existing brick house with a covered window, a lawn and a wood fence, before any work.
Before
Poured concrete slab inside wood form boards against the same brick wall.
After
  1. Rebar grid over black sheeting inside form boards, with rebar cages in the footing trench along the edge.
    Rebar set in the footing trench and tied over black sheeting
  2. Wet concrete slab inside its form boards, with the brick wall of the house behind it.
    The slab poured inside its forms, still wet

Chapter 2: Framing and roof

Walls were framed on the slab against the existing house, then covered in green sheathing panels with framed openings left for the door and windows. The roof framing was decked and covered, which closed the room in before the inside work began.

The closed-in shell from the front, with green sheathing on the walls, a framed opening and the roof covered in underlayment.
Wall framing with diagonal bracing standing on the new slab, beside the brick wall of the house.
Before
The shell seen from the side, with green sheathing, a framed opening under the roof edge and the brick house beside it.
After
  1. Inside the framed room, looking at roof framing, a window opening and the old brick wall.
    Roof framing and a window opening seen from inside the new walls
  2. Rafters and roof sheathing seen from inside the framed room.
    Rafters and roof sheathing seen from inside the new walls

Chapter 3: Inside the room

Inside, the room went in stages. The mini split was mounted in the framing, the walls and ceiling were insulated and closed with drywall, and everything was painted with one dark accent wall. A rubber gym floor, a wall of mirrors and LED lighting in the ceiling molding finished it.

Gym wall with a wood shelf and black bar, a mirror wall on the right, a ceiling fan above and LED light along the ceiling molding.
The framed room seen from inside, looking toward the open doorway with roof framing overhead and a glass panel leaning against the studs.
Before
The finished room looking toward the French doors, with a ceiling fan, a mini split above the mirror wall and LED light along the ceiling.
After
  1. Mini split mounted on a backing board between wall studs, under the roof framing.
    The mini split mounted on a backing board in the stud wall
  2. Drywall sheets hung on the ceiling next to insulation between the rafters.
    Ceiling drywall going up beside insulation between the rafters
  3. Bare room with a dark painted wall on the left, gray walls on the right and a mini split on the far gray wall.
    Walls and ceiling painted before the rubber floor went in

Chapter 4: Brick, doors and landing

The outside walls were finished in brick, laid over the green sheathing next to the new door. A concrete landing was poured at the door, and the roof edge got gutters and outdoor lights.

Doors under the new roof edge between two brick columns, with a gutter above.
Brick going up beside the new door over green sheathing, with metal brick ties showing.
Before
Brick column with a black wall light under the eave, next to the gray door.
After
  1. Brick courses rising at the corner beside the door, with a wood post and a string line at the corner.
    Brick going up at the corner beside the door
  2. Wet concrete between form boards along a brick wall, with plastic sheeting over the door.
    The concrete landing poured beside the door

Scope

What the
work covered.

  • Slab with grade beams and footings, 343 sq ft
  • Engineering foundation report and city permit
  • Structural framing and exterior sheathing
  • Shingle roof with underlayment, flashing and ridge vent
  • Four new vinyl windows and one outdoor-rated French door
  • Custom hidden door
  • Electrical wiring, recessed lights, a ceiling fan and a dedicated line
  • One mini split system
  • Wall and ceiling insulation, drywall and paint
  • Rubber gym flooring with baseboards
  • Brick exterior walls, gutters and a concrete landing at the door
  • Mirrors for the gym wall, plus ceiling molding with LED strip lighting

Start a project

Tell us what
the house needs.

Send the address, a few photos and the rough idea. We will prepare a Feasibility Report before you have spent a dollar.