We built a 343 sq ft gym onto the side of a Grand Prairie house, from the slab and framing to the mirror wall, the rubber floor and the French doors.

A new gym room on the side of the house.
The house is a single-story brick home with a side yard along a wood fence. The job was a gym addition: a new room of 343 sq ft joined to the existing house.
We poured a new slab with grade beams, framed the room, sheathed it and put the roof on, then added the mini split, wiring, insulation and drywall. Inside went a rubber gym floor, a wall of mirrors, a dark accent wall and LED lighting in the ceiling molding. Outside, brick walls, French doors and a small concrete landing close the room to the yard.
The finished work
As it was
handed over.




How it was built
Four parts of the job show how the room went up, from the new slab to the brick and doors.
Chapter 1: Slab and footings
The addition sits against the side of the existing brick house, next to a wood fence. We dug the footing trenches along the wall, set the form boards, tied rebar over black sheeting and poured a 343 sq ft slab with 146 linear feet of grade beams and footings.



-

Rebar set in the footing trench and tied over black sheeting -

The slab poured inside its forms, still wet
Chapter 2: Framing and roof
Walls were framed on the slab against the existing house, then covered in green sheathing panels with framed openings left for the door and windows. The roof framing was decked and covered, which closed the room in before the inside work began.



-

Roof framing and a window opening seen from inside the new walls -

Rafters and roof sheathing seen from inside the new walls
Chapter 3: Inside the room
Inside, the room went in stages. The mini split was mounted in the framing, the walls and ceiling were insulated and closed with drywall, and everything was painted with one dark accent wall. A rubber gym floor, a wall of mirrors and LED lighting in the ceiling molding finished it.



-

The mini split mounted on a backing board in the stud wall -

Ceiling drywall going up beside insulation between the rafters -

Walls and ceiling painted before the rubber floor went in
Chapter 4: Brick, doors and landing
The outside walls were finished in brick, laid over the green sheathing next to the new door. A concrete landing was poured at the door, and the roof edge got gutters and outdoor lights.



-

Brick going up at the corner beside the door -

The concrete landing poured beside the door
Scope
What the
work covered.
- Slab with grade beams and footings, 343 sq ft
- Engineering foundation report and city permit
- Structural framing and exterior sheathing
- Shingle roof with underlayment, flashing and ridge vent
- Four new vinyl windows and one outdoor-rated French door
- Custom hidden door
- Electrical wiring, recessed lights, a ceiling fan and a dedicated line
- One mini split system
- Wall and ceiling insulation, drywall and paint
- Rubber gym flooring with baseboards
- Brick exterior walls, gutters and a concrete landing at the door
- Mirrors for the gym wall, plus ceiling molding with LED strip lighting
Keep looking
More
projects.

Previous · Flower Mound
Shed converted to a workspace
A backyard shed in Flower Mound, insulated, wired and finished inside as an office or workspace.

Next · Highland Village
Two-story addition with family room and stairs
A two-story addition with a family room and stairs below, and a bedroom and bath above.