A backyard shed was cleared out, insulated and finished inside. It now has French doors, an awning over the entry, plank flooring and a mini split.

A shed with a workbench, rebuilt as a room.
The shed held a workbench, wall cabinets, a desk and a rug, with bare wood walls and open joists overhead. The job was to convert it into an office or workspace.
The work covered French doors and an awning over the entry, spray foam insulation, new wiring and outlets, drywall with wood battens, paint, plank flooring, baseboards and trim, and a mini split.
The finished work
As it was
handed over.




How it was built
The job ran in three stages: clearing the shed and setting the openings, then insulation and walls, then paint, floor and the entry.
Chapter 1: Cleared out, with doors and windows set
The workbench, cabinets, desk and rug came out, leaving the wall framing exposed and the ceiling joists open. A window went into the framed wall, and wood trim went on around the door. The back wall, once a desk, a pegboard and a small window, ended as a paneled wall with a white-trimmed window.



-

The back wall with the workbench, cabinets and desk gone and the framing exposed -

A sliding window set into the exposed wall framing -

Wood trim beside the door, checked with a level
Chapter 2: Insulation, walls and the mini split
Open cell spray foam went onto the walls and between the ceiling joists. New wiring went in, then drywall with wood battens was fixed over the walls. A mini split went in, with its indoor unit on the wall and its outdoor unit on an outside wall.



-

Spray foam on the walls and between the ceiling joists -

Drywall with wood battens over it and joint compound still showing -

The outdoor mini split unit on an outside wall
Chapter 3: Paint, floor and the entry
The walls were primed and then painted light yellow, with paper laid over the plank flooring while the painting went on. Outside, the siding by the doors was painted and the French doors were masked, with the awning already overhead. Inside, the doors now sit in a trimmed opening with baseboards along the floor.



-

The paneled walls primed white -

Light yellow paint on the walls, with the plank floor covered in paper -

Siding painted and the French doors masked beneath the awning
Scope
What the
work covered.
- Glass double French doors, with hardware, flashing, weatherproofing and framing changes
- Open cell spray foam insulation in the walls, ceiling and roof
- Drywall with tape, mud and finishing, with wood battens over it
- Primer and interior paint, with caulking and surface preparation
- New outlets, switches, wiring and breaker connections
- Mini split HVAC system with line set and electrical disconnect
- LVP plank flooring with underlayment and transitions
- Baseboards, plus door and window trim
- Exterior awning over the entry, framed, roofed, flashed and painted
- Exterior touch-ups: minor siding repairs, caulking and paint
Keep looking
More
projects.

Previous · Midlothian
Suite addition with kitchenette and bath
A new wing behind the house with a kitchenette, a full bath and a carpeted room, built on a new slab.

Next · Grand Prairie
Gym addition with a mirror wall
A 343 sq ft gym addition in Grand Prairie with a mirror wall, rubber floor and French doors.
Start a project
Tell us what
the house needs.
Send the address, a few photos and the rough idea. We will prepare a Feasibility Report before you have spent a dollar.