Additions · Midlothian

Suite addition with kitchenette and bath

Awesome Additions

A single-story wing went onto the back of the house, with a kitchenette, a full bath and a carpeted room, all under a shingle roof and clad in brick.

Kitchenette with white cabinets, a sink under a window, a tall cabinet and a black door, with a refrigerator at the left.

A new wing on the back of the house.

Behind the house there was a lawn with stepping stones beside a brick wall and a side gate. The job added a single-story wing there, on a new concrete slab.

The wing is framed in wood, roofed with shingles and clad in brick, with black gutters. Inside it has a main room with a sliding glass door and a kitchenette, a full bath with a tiled shower and a double vanity, and a carpeted room with a closet.

At the end of the job a concrete patio slab was poured outside the sliding glass door.

Location
Midlothian, TX
Scope
Kitchenette, full bath and carpeted room
Size
510 sq ft
Foundation
New concrete slab
Exterior
Brick walls, shingle roof and black gutters
Built
May 2025 to December 2025

The finished work

As it was
handed over.

How it was built

The job went from slab to frame, then plumbing and wiring, drywall, tile and finishes. Three parts of the wing tell most of it.

Chapter 1: Slab, frame and brick

The wing started as a concrete slab poured behind the house. Walls and roof framing went up on it, followed by sheathing and shingles. With the windows and doors set, the old brick wall between the house and the new frame was taken out and the new frame was tied into the house. Brick went on the outside walls after that.

Hip roof, black gutter and brick wall of the finished wing under a blue sky.
The back of the house before the work, with a brick wall and window, stepping stones across the lawn and the side gate.
Before
The finished wing with brick walls, a hip roof, black gutters, a window and a black-framed glass door.
After
  1. Slab forms with rebar under black plastic sheeting, beside a garage and a dumpster.
    Slab forms with rebar under black plastic sheeting
  2. Fresh concrete in the slab forms beside the house, with workers at the far edge.
    Concrete placed in the slab forms
  3. Wood wall framing and roof framing on the new slab.
    Walls and roof framing in place on the slab

Chapter 2: Main room and kitchenette

The main room was framed with a sliding glass door and a window, then plumbed and wired before the drywall went up. Floor tile came after the drywall. The finished room has a kitchenette with white cabinets and a quartz counter, a ceiling fan and two interior doorways, one of them into the bath.

Two white interior doors beside the refrigerator and kitchenette cabinets, over wood-look floor tile.
The main room framed with the sliding glass door in place and the roof framing overhead, before drywall.
Before
The finished main room with the sliding glass door, a ceiling fan and two doorways, one showing the bath vanity.
After
  1. Open framing with plumbing pipes, wiring and coiled black tubing on the slab.
    Plumbing and wiring in the open framing
  2. Two workers hanging drywall on the walls and ceiling.
    Drywall going up on the walls and ceiling
  3. Wood-look floor tile laid with yellow leveling clips.
    Wood-look floor tile laid with leveling clips

Chapter 3: The bath

The bath started as framed walls with drain lines in the open floor. The shower base was built up and the plumbing tested before any tile went on. Then came tile for the shower and the floor, the double vanity with its plumbing, and paint.

Bath wall with a three-light sconce and a towel bar, and the tiled shower beyond.
Framing and drain pipes rising from an opening in the slab, before the bath walls were closed.
Before
The finished bath with a double vanity, a toilet and the tiled shower with its pebble floor.
After
  1. Wood-look floor tile laid around a capped pipe, next to the pebble-tiled shower floor.
    Bath floor tile laid beside the pebble shower floor
  2. Open vanity cabinet showing the drain and supply lines under the sink.
    Plumbing connected under the vanity
  3. Double vanity with faucets set, a painted wall and wire boxes waiting for fixtures.
    Vanity set with faucets and the walls painted

Scope

What the
work covered.

  • Concrete slab foundation for a one-story addition, and a patio slab outside the sliding glass door
  • Wall and roof framing with sheathing, and a shingle roof with underlayment
  • Brick walls, black gutters and downspouts
  • New windows, an exterior door and a sliding glass door
  • Old brick wall removed and the new frame tied into the house
  • Plumbing rough-in, top-out and trim, with a built-up shower base
  • Electrical wiring, recessed lights and ceiling fans
  • Air conditioning for the addition
  • Insulation, drywall, texture and paint
  • Wood-look floor tile and carpet
  • Tiled shower with a pebble floor and niche, and a double vanity with a quartz top
  • Kitchenette cabinets, quartz counter and sink

Start a project

Tell us what
the house needs.

Send the address, a few photos and the rough idea. We will prepare a Feasibility Report before you have spent a dollar.